Merri Creek Bridges

Reinforced Earth® Walls
TerraPlus®

Location:
Melbourne, VIC, Australia
Owner:
Vicroads
Consultants:
Sinclair Knight Merz
Contractor:
Abigroup Contractors
Construction:
September 2004

The 17 km Craigieburn Bypass, an important upgrading of Melbourne’s road network, will link the Hume Freeway near Mt Ridley Road at Craigieburn, to the Metropolitan Ring Road at Thomastown. The bypass will encourage traffic to remain on the freeway network and away from local roads, greatly improving road safety and reducing congestion. Motorists will enjoy uninterrupted travel on the bypass between Craigieburn and Thomastown, with expected travel time savings of up to 30 minutes during peak hour journeys.

The bypass is expected to deliver more than $1 billion of economic benefits to Victoria, over 30 years, through lower travel times, fewer accidents, fuel savings and road safety improvements.

The $306m project is fully funded by the Australian Government, being delivered by the State Government road agency, VicRoads, in four stages. Work on the bypass started in May 2002, with completion expected during the second half of 2005.

Features along the bypass include interchanges, shared pathways and crossings, landscaping and noise walls.

Abigroup contractors approached The Reinforced Earth Company (RECO) to design and supply over 3000m² of Reinforced Earth abutments for the following major bridges.

  • South Bound Exit Ramp
  • Curly Sedge Creek
  • O’Herns Road Bridge and Pedestrian Underpass
  • Merri Creek Bridges

Merri Creek begins near Wallan, a town on Melbourne's northern outskirts, and joins the Yarra River at Dight's fall, Collingwood approximately 70km downstream.

The Creek is highly treasured from an environmental perspective; hence any development along its course is extremely sensitive and should have minimum aesthetic and environmental impact on its surroundings.

RECO designed the abutment walls with the bridge loads supported on piles, in accordance with Vic Roads Specification Section 682 to a design life of 100 years. Deliverables included:

  • Detailed Design including Design Drawings and Specifications.
  • Technical assistance throughout the design and construction phase.
  • Manufacture and delivery of the specialised construction materials: steel reinforcing strips and concrete facing panels.

For the Merri Creek Bridges RECO worked closely with Abigroup’s Project manager, Mr. Rob Cairns in developing a new random Bluestone appearance for the facing panels of the reinforced soil walls.

The panel was specially created to achieve a look, which mimics that created traditionally by fixing natural Bluestone rock to cast insitu walls.

The benefits of using a precast panel were that the contractor was saved valuable construction time and safety issues of fixing rock to the wall at heights of up to 15m were eliminated.

Project Specifications

System
TerraPlus®
Structure
Bridge Abutments (False)
Area
3042m²
Height
15.4m
Length
166m (total)
Design Load
Design Load 23kPa (ULL)
Design Life
100 years
Finish
Random Bluestone Rock

Other Interesting Case Studies

North Kiama Bypass

South Coast, NSW, Australia

M2 Motorway Upgrade

Sydney, NSW, Australia

Dinmore to Goodna

Dinmore, QLD, Australia

Granard Road Duplication

Brisbane, QLD, Australia