cookie-detector@createit.pl

About y8Zd8OTYSc

This author has not yet filled in any details.
So far y8Zd8OTYSc has created 60 blog entries.

Las Tórtolas tailing dam

2020-01-10T18:57:01+00:00March 2nd, 2015|Project|

Background In October 2007 Anglo American approved an investment of US$2.4 billion to expand its Los Bronces open cut copper and molybdenum mine, high in the Andes Mountains of Chile. The expansion includes new grinding facilities in the Confluencia sector, a flotation plant at Las Tórtolas (Colina) and [...]

World Premiere: Reinforced Earth® equips the high-speed railway lines

2020-01-10T18:57:25+00:00December 4th, 2014|Project|

The construction of Reinforced Earth® walls for the South-Europe-Atlantique (SEA) high-speed line (LGV) linking Tours to Bordeaux was completed in September 2014. Eleven structures totalling 20 walls were built, mainly to support the railway tracks on both sides of flyovers. The highest structure is 12.70 m high. For two of [...]

RECO won The Concrete Institute of Australia Branch’s award

2020-01-10T19:02:31+00:00November 19th, 2014|Company|

The Concrete Institute of Australia Branch held their Annual Dinner last Friday 31st October 2014 in Perth. RECO is very proud to announce that we won an award on the night. The award was for the design and construction of a Reinforced Earth® TechSpan® arch at Mining Area [...]

Nigeria – Third interchange project for Reinforced Earth

2020-01-10T18:57:35+00:00October 28th, 2014|Project|

Bayelsa is a state of southern Nigeria in the core Niger Delta region. It has one of the largest crude oil and natural gas deposits in Nigeria. As part of the massive infrastructure modernization in Yenagoa, the capital of Bayelsa, 2 new interchanges will be created at each end of [...]

Chile – Bridge abutments in Reinforced Earth on a crossroad

2020-01-10T18:58:16+00:00October 21st, 2014|Project|

In Chile Tierra Armada teams have achieved the construction of 2 Reinforced Earth® bridge abutments on a exchanger being constructed on the Route 160. These walls consist of 2,836 m² TerraClass® walls with galvanized steel strip reinforcements. More about: Roads & Motorways Download [...]

Thailand – Widening Highway 11

2020-01-10T18:59:33+00:00August 21st, 2014|Project|

To manage increased traffic flow on Highway 11 connecting the cities of Uttaradit and Denchai in the North of the country, the Department of Highways decided to widen this route passing through mountainous country from two to four lanes. To avoid the need for large volumes of backfill [...]

Croatia – Sveta Trojica wall

2020-01-10T18:59:54+00:00July 28th, 2014|Project|

1 km West of the village of Križišće stands the imposing Reinforced Earth® structure of Sveta Trojica: A three-tiered wall with max. height 34 m and 375 m long. The total surface area is 11,170 m². Terre Armée designed the structure and supplied the GeoStrap® reinforcements, and connections. More about: Roads [...]

AUSTRALIA – Regional Rail Link, West Werribee Junction

2020-01-10T19:00:03+00:00December 11th, 2012|Project|

The Regional Rail Link Project, located in the Victoria state, has been inaugurated this year. For this significant project, RECO Australia provided several Reinforced Earth® structures. On the West Werribee Junction section, RECo Australia was required to design and supply two Reinforced Earth® retaining walls and six flyover walls for a total surface of 5,517 m². [...]

Go to Top