{"id":3911,"date":"2018-03-21T15:30:55","date_gmt":"2018-03-21T15:30:55","guid":{"rendered":"http:\/\/www.www.reco.com.au\/?p=3911"},"modified":"2024-06-06T06:16:52","modified_gmt":"2024-06-06T06:16:52","slug":"australia-reco-takes-part-in-the-massive-northlink-wa-project","status":"publish","type":"post","link":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/","title":{"rendered":"Australia: RECo takes part in the massive NorthLink WA project"},"content":{"rendered":"

<\/span><\/div><\/div>
<\/div>
<\/div>
<\/div>

In Perth, Reinforced Earth designs and supplies 31,000 m\u00b2 of TerraTilt\u00ae and TerraPlus\u00ae facing as part of the NorthLink West Australia road project.<\/h2>\n

In 2016, the city of Perth embarked on highway construction works intended to meet the needs of a rapidly growing population. This large-scale project, delivered by Main Roads WA and entitled NorthLink WA<\/a>, provided the region with a safer and more extensive road network by 2019. Divided into three phases, NorthLink WA consisted in both upgrading existing links and the construction of new highways.<\/p>\n

RECo Australia is designing and supplying\u00a0TerraTilt\u00ae\u00a0and\u00a0TerraPlus\u00ae\u00a0precast concrete panels. Having successfully completed its first mission in phase one, RECo Australia has won further contracts for the remaining two phases of the project:<\/p>\n

Phase 1: Southern section: Guilford road to Reid Highway – completed<\/span>
\nDesign and supply of\u00a03,500 m\u00b2\u00a0of\u00a0TerraTilt\u00ae\u00a0facing panels on three bridges;<\/p>\n

Phase 2: Central section: Reid Highway to Ellenbrook \u2013 work underway<\/span>
\nDesign and supply of\u00a012,000 m\u00b2\u00a0of\u00a0TerraTilt\u00ae\u00a0facing panels on ten bridges;<\/p>\n

Phase 3: Northern section: Ellenbrook to Muchea \u2013 upcoming<\/span>
\nDesign and supply of\u00a016,000 m\u00b2\u00a0of\u00a0TerraTilt\u00ae\u00a0facing panels and\u00a0TerraPlus\u00ae\u00a0modular facing panels on several bridges and retaining walls.<\/p>\n

About NorthLink Western Australia<\/h4>\n

Construction of NorthLink WA is now complete and provides a vital link between Morley and Muchea as part of the Perth-Darwin National Highway.<\/p>\n

The project was WA’s biggest ever road initiative, servicing regional traffic movements to areas such as Kewdale, Malaga, Perth Airport and the CBD. At an road infrastructure investment of more than $1 billion, the project generated more than 7000 jobs.<\/p>\n

The project delivered the following benefits:<\/p>\n

    \n
  • \n
    Improved traffic flow and journey times for road users<\/div>\n<\/li>\n
  • \n
    Reduced driver frustration and congestion<\/div>\n<\/li>\n
  • \n
    Improved freight efficiency, relieving pressure on the Great Northern Highway through the Swan Valley<\/div>\n<\/li>\n
  • \n
    Improved amenity for the community, tourists and road users<\/div>\n<\/li>\n<\/ul>\n

     <\/p>\n

    \"\"<\/p>\n

     <\/p>\n

     <\/p>\n

    Offering\u00a0savings\u00a0on equipment and costs, as well as in terms of time, Reinforced Earth\u00ae solutions once again prove their\u00a0effectiveness\u00a0and durability.<\/p>\n<\/div>

    <\/div><\/div><\/div><\/div><\/div>

    Localisation<\/h2>\n<\/div>
    <\/div><\/div><\/div><\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":3914,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[187],"tags":[],"class_list":["post-3911","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project"],"yoast_head":"\nAustralia: RECo takes part in the massive NorthLink WA project - RECo (Australia)<\/title>\n<meta name=\"description\" content=\"Reinforced Earth designs and supplies 31,000 m\u00b2 of TerraTilt\u00ae and TerraPlus\u00ae facing as part of the NorthLink West Australia road project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Australia: RECo takes part in the massive NorthLink WA project - RECo (Australia)\" \/>\n<meta property=\"og:description\" content=\"Reinforced Earth designs and supplies 31,000 m\u00b2 of TerraTilt\u00ae and TerraPlus\u00ae facing as part of the NorthLink West Australia road project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/\" \/>\n<meta property=\"og:site_name\" content=\"RECo (Australia)\" \/>\n<meta property=\"article:published_time\" content=\"2018-03-21T15:30:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-06-06T06:16:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2020\/01\/M1-4.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"480\" \/>\n\t<meta property=\"og:image:height\" content=\"360\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"y8Zd8OTYSc\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"y8Zd8OTYSc\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/\"},\"author\":{\"name\":\"y8Zd8OTYSc\",\"@id\":\"https:\/\/www.reco.com.au\/#\/schema\/person\/b564cb1190f2fcfd9242cc753d4505be\"},\"headline\":\"Australia: RECo takes part in the massive NorthLink WA project\",\"datePublished\":\"2018-03-21T15:30:55+00:00\",\"dateModified\":\"2024-06-06T06:16:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/\"},\"wordCount\":1097,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.reco.com.au\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2020\/01\/M1-4.jpeg\",\"articleSection\":[\"Project\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/\",\"url\":\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/\",\"name\":\"Australia: RECo takes part in the massive NorthLink WA project - RECo (Australia)\",\"isPartOf\":{\"@id\":\"https:\/\/www.reco.com.au\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2020\/01\/M1-4.jpeg\",\"datePublished\":\"2018-03-21T15:30:55+00:00\",\"dateModified\":\"2024-06-06T06:16:52+00:00\",\"description\":\"Reinforced Earth designs and supplies 31,000 m\u00b2 of TerraTilt\u00ae and TerraPlus\u00ae facing as part of the NorthLink West Australia road project.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#primaryimage\",\"url\":\"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2020\/01\/M1-4.jpeg\",\"contentUrl\":\"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2020\/01\/M1-4.jpeg\",\"width\":480,\"height\":360},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.reco.com.au\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Australia: RECo takes part in the massive NorthLink WA project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.reco.com.au\/#website\",\"url\":\"https:\/\/www.reco.com.au\/\",\"name\":\"Reinforced Earth in Australia and New Zealand\",\"description\":\"Reinforced Earth in Australia and New Zealand, Expertise and experience in reinforced backfill applications and soil-structure interaction.\",\"publisher\":{\"@id\":\"https:\/\/www.reco.com.au\/#organization\"},\"alternateName\":\"RECO australia\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.reco.com.au\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.reco.com.au\/#organization\",\"name\":\"Reinforced Earth Company in Australia\",\"url\":\"https:\/\/www.reco.com.au\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.reco.com.au\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2022\/06\/RE_logV_CQ.png\",\"contentUrl\":\"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2022\/06\/RE_logV_CQ.png\",\"width\":1000,\"height\":382,\"caption\":\"Reinforced Earth Company in Australia\"},\"image\":{\"@id\":\"https:\/\/www.reco.com.au\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/reinforced-earth-australia\/\",\"https:\/\/www.youtube.com\/user\/terrearmeegroup\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.reco.com.au\/#\/schema\/person\/b564cb1190f2fcfd9242cc753d4505be\",\"name\":\"y8Zd8OTYSc\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.reco.com.au\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9ee842e66af1003df524aa84ea024e77?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9ee842e66af1003df524aa84ea024e77?s=96&d=mm&r=g\",\"caption\":\"y8Zd8OTYSc\"},\"url\":\"https:\/\/www.reco.com.au\/author\/y8zd8otysc\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Australia: RECo takes part in the massive NorthLink WA project - RECo (Australia)","description":"Reinforced Earth designs and supplies 31,000 m\u00b2 of TerraTilt\u00ae and TerraPlus\u00ae facing as part of the NorthLink West Australia road project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/","og_locale":"en_US","og_type":"article","og_title":"Australia: RECo takes part in the massive NorthLink WA project - RECo (Australia)","og_description":"Reinforced Earth designs and supplies 31,000 m\u00b2 of TerraTilt\u00ae and TerraPlus\u00ae facing as part of the NorthLink West Australia road project.","og_url":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/","og_site_name":"RECo (Australia)","article_published_time":"2018-03-21T15:30:55+00:00","article_modified_time":"2024-06-06T06:16:52+00:00","og_image":[{"width":480,"height":360,"url":"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2020\/01\/M1-4.jpeg","type":"image\/jpeg"}],"author":"y8Zd8OTYSc","twitter_card":"summary_large_image","twitter_misc":{"Written by":"y8Zd8OTYSc","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#article","isPartOf":{"@id":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/"},"author":{"name":"y8Zd8OTYSc","@id":"https:\/\/www.reco.com.au\/#\/schema\/person\/b564cb1190f2fcfd9242cc753d4505be"},"headline":"Australia: RECo takes part in the massive NorthLink WA project","datePublished":"2018-03-21T15:30:55+00:00","dateModified":"2024-06-06T06:16:52+00:00","mainEntityOfPage":{"@id":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/"},"wordCount":1097,"commentCount":0,"publisher":{"@id":"https:\/\/www.reco.com.au\/#organization"},"image":{"@id":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2020\/01\/M1-4.jpeg","articleSection":["Project"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/","url":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/","name":"Australia: RECo takes part in the massive NorthLink WA project - RECo (Australia)","isPartOf":{"@id":"https:\/\/www.reco.com.au\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#primaryimage"},"image":{"@id":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2020\/01\/M1-4.jpeg","datePublished":"2018-03-21T15:30:55+00:00","dateModified":"2024-06-06T06:16:52+00:00","description":"Reinforced Earth designs and supplies 31,000 m\u00b2 of TerraTilt\u00ae and TerraPlus\u00ae facing as part of the NorthLink West Australia road project.","breadcrumb":{"@id":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#primaryimage","url":"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2020\/01\/M1-4.jpeg","contentUrl":"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2020\/01\/M1-4.jpeg","width":480,"height":360},{"@type":"BreadcrumbList","@id":"https:\/\/www.reco.com.au\/australia-reco-takes-part-in-the-massive-northlink-wa-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.reco.com.au\/"},{"@type":"ListItem","position":2,"name":"Australia: RECo takes part in the massive NorthLink WA project"}]},{"@type":"WebSite","@id":"https:\/\/www.reco.com.au\/#website","url":"https:\/\/www.reco.com.au\/","name":"Reinforced Earth in Australia and New Zealand","description":"Reinforced Earth in Australia and New Zealand, Expertise and experience in reinforced backfill applications and soil-structure interaction.","publisher":{"@id":"https:\/\/www.reco.com.au\/#organization"},"alternateName":"RECO australia","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.reco.com.au\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.reco.com.au\/#organization","name":"Reinforced Earth Company in Australia","url":"https:\/\/www.reco.com.au\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.reco.com.au\/#\/schema\/logo\/image\/","url":"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2022\/06\/RE_logV_CQ.png","contentUrl":"https:\/\/www.reco.com.au\/wp-content\/uploads\/sites\/12\/2022\/06\/RE_logV_CQ.png","width":1000,"height":382,"caption":"Reinforced Earth Company in Australia"},"image":{"@id":"https:\/\/www.reco.com.au\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/reinforced-earth-australia\/","https:\/\/www.youtube.com\/user\/terrearmeegroup"]},{"@type":"Person","@id":"https:\/\/www.reco.com.au\/#\/schema\/person\/b564cb1190f2fcfd9242cc753d4505be","name":"y8Zd8OTYSc","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.reco.com.au\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/9ee842e66af1003df524aa84ea024e77?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9ee842e66af1003df524aa84ea024e77?s=96&d=mm&r=g","caption":"y8Zd8OTYSc"},"url":"https:\/\/www.reco.com.au\/author\/y8zd8otysc\/"}]}},"_links":{"self":[{"href":"https:\/\/www.reco.com.au\/wp-json\/wp\/v2\/posts\/3911"}],"collection":[{"href":"https:\/\/www.reco.com.au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.reco.com.au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.reco.com.au\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.reco.com.au\/wp-json\/wp\/v2\/comments?post=3911"}],"version-history":[{"count":1,"href":"https:\/\/www.reco.com.au\/wp-json\/wp\/v2\/posts\/3911\/revisions"}],"predecessor-version":[{"id":10110,"href":"https:\/\/www.reco.com.au\/wp-json\/wp\/v2\/posts\/3911\/revisions\/10110"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.reco.com.au\/wp-json\/wp\/v2\/media\/3914"}],"wp:attachment":[{"href":"https:\/\/www.reco.com.au\/wp-json\/wp\/v2\/media?parent=3911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.reco.com.au\/wp-json\/wp\/v2\/categories?post=3911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.reco.com.au\/wp-json\/wp\/v2\/tags?post=3911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}